The Project

Protest was engaged to undertake a deep excavation assessment for the installation of a large underground storage tank.

Our Solution

A 5.0 to 6.0m deep excavation required our expert assessment on the stability of the area, advice on potential undermining of adjacent structures and general advice on suitable methodology to enable site personnel to safely work at the base.