Skip to main content

Bored Piles

Protest Engineering has experience with bored pile design, certification, and construction methodology support across both the building and infrastructure industries including but not limited to; building foundations, secant pile/soldier pile walls and transmission tower foundations.

Project examples comprise:

  • The supervision and certification of over 300 transmission tower foundations in the Pilbara region throughout 2020;
  • The certification of 180 transmission towers throughout the Sunshine Coast in 2019 including the investigation, design and certification of over 100 temporary working platforms;
  • The design of 15 m secant/soldier pile basement retention system;
  • Certification of 18 bridge bored piers in North Queensland in accordance with MRTS63 including fulltime onsite RPEQ, downhole camera and Pile Integrity Testing;